An operating system keeps one true state, runs every process with permissions, schedules the work, and logs everything. Progros does that for a program — requirements, plans, work, proof, and acceptance in one live graph that your engineers, coding agents, and customer all work from.

Built to be the best way to take a complex system from what the customer asked for to what they signed off.

Start with one requirements document. No migration, no process change.

Program · Infusion pump IP-2
    One requirement's life in Progros. Agents propose, people decide, git and CI move the status, and the customer accepts. The Elicitor proposes requirement R-7 from the spec, quoting its line. The Analyst finds a gap and proposes R-8. The systems lead baselines both and the customer agrees what done means. The Decomposer plans work W-12 and a bench test. A merged branch moves W-12 to done. CI tests that name R-7 verify it. The customer tightens R-7, and everything built on the old text turns suspect. A witnessed bench run proves the new text, and the customer accepts the scenario.

    01 Why now

    AI made building fast. Nothing around it got faster.

    An agent can turn a precise, testable spec into working, tested code in minutes. So the constraint moved — to knowing what to build, proving it works, and getting it accepted. That is the work Progros manages.

    01

    Specification clarity

    An agent builds the wrong thing faithfully, fast, and at scale. Ambiguity is now a throughput problem.

    02

    Verification capacity

    Test benches, device labs, hardware, qualified witnesses, customer experts. None of it got faster.

    03

    Stakeholder trust

    Output volume rose. The rate at which customers absorb, train on, and accept change did not.

    04

    Judgment

    What should be true, what risk is acceptable, what evidence is enough. Not delegable — and never delegated.

    02 What it costs

    Four failures every program lead has lived.

    1. 01

      We built the wrong thing — fast.

      The requirement was ambiguous. The agent didn't ask. Nobody noticed until the demo.

    2. 02

      "Verified" — three architecture changes ago.

      The results are real. Which ones still hold, nobody can say.

    3. 03

      Month five: the test bench is booked until month nine.

      The binding constraint was physical, and invisible to every tool in use.

    4. 04

      Shipped. Refused.

      The customer wouldn't operate a capability nobody had agreed how to accept.

    Every one of them was knowable in week two — by a tool that modeled intent, evidence, and reality.

    03 The structural gap

    A ticket records activity.
    A claim records what's true.

    PRJ-1423 · StoryIssue tracker

    Implement session timeout

    Done5 ptsSprint 14test-results-final-v2.xlsx

    • Which requirement does this satisfy?
    • Proven on which build — and is that still true?
    • Which customer need does it serve?
    • Has the customer agreed what "done" means?
    R-1.3 · Requirement · Baseline v4Progros

    Sessions expire after 30 minutes of inactivity.

    Serves
    N-2 · Users distrust apps holding health data
    Accepted when
    Given an idle session, after 30 minutes the next request is refused · agreed with the customer
    Proven by
    2 tests at 9f1c2ab7 on main · evidence current
    Method
    Automated test · @verifies in auth.spec.ts
    Scenario
    C-2 Returning user on a shared device
    Provenance
    Proposed by the Elicitor agent · approved by the security lead

    Your tracker isn't bad at this. It's structurally incapable of it.

    04 The diagnostic

    Each one looked like a finished requirement.

    Input · a fitness app, verbatim · 12 lines
    1. User Authentication – Secure login with email/password and optional social login.
    2. Goal Setting – Users can create and update fitness goals.
    3. Activity Tracking – Log workouts, distance, and calories burned.
    4. Progress Reports – Generate weekly/monthly summaries.
    5. Notifications – Send reminders for workouts and milestones.
    6. Data Export – Export activity data in CSV format.
    7. Performance: App must load within 2 seconds on mobile devices.
    8. Security: Data encrypted at rest and in transit; comply with GDPR.
    9. Reliability: 99.9% uptime during business hours.
    10. Usability: Intuitive UI; accessible to users with basic literacy.
    11. Scalability: Support up to 10,000 concurrent users.
    12. Must be developed using React Native.
    "comply with GDPR"Critical

    Health data is special-category data.

    Explicit consent, a mandatory impact assessment, rights to access and erasure. Three words expand to a quarter of the real scope.

    "99.9% uptime"Critical

    Unverifiable before launch. Ever.

    It needs weeks of production observation. A launch gate of "all requirements verified" is arithmetically impossible.

    (not in the document)Critical

    Offline logging is missing entirely.

    People log workouts in basements and on trails. No line-by-line review finds a requirement that isn't there.

    "during business hours"High

    The SLO is silent when it matters.

    Fitness apps peak mornings, evenings, and weekends — precisely outside the window. Whose time zone, anyway?

    A line-by-line review reads the text. Progros checks what the text implies — and what it leaves out. Minutes after upload, with every claim citing the line it came from.

    05 How it works

    From the customer's words to proof they'll accept.

    One graph, built by agents that propose and people who decide. Every screen and report is a view of it — so none of them can drift.

    1. 01

      Capture

      Upload a spec, statement of work, or feature list — PDF, Word, or text, scanned pages included — or import from a spreadsheet or ReqIF. The Elicitor proposes atomic, testable claims, each quoting the exact line it came from.

      R-7 The system shall let users log workouts, distance, and calories.“Log workouts, distance, and calories burned.” · line 3
    2. 02

      Diagnose

      The Analyst reads the whole specification: implied obligations, unverifiable claims, conflicts, gaps. You acknowledge, resolve, or dismiss with a reason — and dismissals stay dismissed.

      Critical Implied obligation · GDPR Art. 9 health data targets R-12, CON-1 · 2 proposed requirements
    3. 03

      Agree what "done" means

      Progros derives the customer's intent, end-to-end acceptance scenarios, and criteria for every requirement — and asks the customer instead of inventing a number.

      Given no connectivity, a logged workout is kept and syncs within [TBD: maximum sync delay]Question for the customer · R-26
    4. 04

      Plan

      The Decomposer proposes components, work items with a definition of done, and how each requirement will be proven — for any number of requirements. Your leads review it like everything else.

      CMP-3 Pump controller → W-12 Occlusion trip · satisfies R-7 · done when the pump stops within 100 ms at 6 bar on the bench
    5. 05

      Build — people and agents

      Work lands on a board with its requirements and criteria attached. Coding agents take it over MCP. A branch named for the work starts it; the merge finishes it — no status updates.

      feature/W-12-occlusion merged → W-12 done · by the repository webhook
    6. 06

      Prove it

      Tests that name a requirement land as evidence pinned to the commit. Bench runs, inspections, and analyses are recorded with their files and, where rigor demands it, a witness.

      ✓ R-7 3 tests at 9f1c2ab · ✓ R-8 bench run 17, witnessed · ✗ R-3 1 failed
    7. 07

      Absorb change

      When a requirement changes, every plan, work item, and piece of proof made against the old text turns suspect — shown in review before anyone accepts the change, and to agents before they build on it.

      ⚠ R-7 changed after W-12 was planned · proof out of date · still valid?
    8. 08

      Deliver the proof

      A live view of what is proven, failing, and out of date. Seal a baseline, and hand the customer an evidence package: every claim, its proof and files, checksummed.

    06 For engineers

    Engineers never open it to update a status.

    Work arrives with the requirements, criteria, and test method attached. Name the branch for it and the merge closes it. Annotate the test you were writing anyway, and every CI run lands as evidence pinned to the commit it proves. People make only the judgment calls.

    • Proposed agent drafts
    • Baselined you decide
    • Allocated inferred
    • Designed inferred
    • Implemented inferred
    • Verified from evidence
    • Validated you decide
    • Accepted the customer signs

    Conventions are encouraged — never a merge gate. Bookkeeping must never block shipping.

    // auth.spec.ts — the test you were writing anyway
    test(
      'session expires after 30 min idle @verifies("R-1.3")',
      async () => {
        // …
      });
    $ node progros.mjs report-tests results/*.xml
    Progros: 214 tests (213 passed, 1 failed) at 9f1c2ab7e0d4
      ✓ R-1.3  2 test(s)
      ✓ R-2.1  4 test(s)
      ✗ R-3.4  3 test(s), 1 failed
      → R-3.4 verified → implemented
      ⚠ unknown requirement refs: R-9.9 — check the annotations

    Works with any CI that writes JUnit XML — Bitbucket, GitHub, GitLab, and the rest. Coding agents connect over MCP: they read the work and its acceptance contract, ask your team when the spec is unclear, and can never edit the specification.

    07 Bid mode

    Price the program before you win it.

    The same system scopes a bid. Requirements become the customer's intent, a reviewed work breakdown, and estimates with their basis — priced with your own rates and costs. Win, and the bid is already the program.

    1. 01

      Estimates with a basis.

      The Estimator proposes three-point hours for every work item, with its reasoning and risks. Your leads adjust them. Hours or story points.

    2. 02

      Your rates, your costs.

      Rate cards by labor category, subcontracts, materials, travel, and any line you need — through overhead, G&A, contingency, and fee.

    3. 03

      Price to win.

      Model competitors' likely prices and the customer's budget; see the chance of winning and the expected profit at every price.

    4. 04

      A document to send.

      Scope, assumptions, schedule, and price in a bid document — with your price-to-win analysis kept out of it.

    Infusion pump IP-2 · Bid v3Illustrative
    Direct labor 9,675 h across 6 categories$1,018,400
    Overhead 38% of labor$386,990
    Subcontracts & materials$214,000
    Travel & other direct costs$36,500
    Contingency from estimate risk$96,800
    G&A 12%$210,320
    Fee 10%$196,300
    Price$2,159,310

    Price to win at this price: 58% chance to win · expected profit $114k

    08 Governed AI

    AI you can hand to an auditor.

    1. 01

      Agents propose.

      Narrow roles, not one chatbot — an Elicitor, an Analyst, a Decomposer, an Estimator — each with a registered, versioned prompt.

    2. 02

      People baseline.

      Every proposal goes through review: accept, amend, or reject. How much agents may do on their own is set by the program's rigor.

    3. 03

      Provenance is permanent.

      Every contribution records who or what made it, which model and prompt, and who approved it — on a tamper-evident, hash-chained log. Every model call is on a ledger with its cost. Your data never trains a model.

    Program Atlas · Baseline v4Illustrative

    › Show everything in this baseline that came from an AI proposal, and who approved it.

    ClaimOriginDecisionBy
    R-1.3ElicitorApprovedSecurity lead
    R-8.11AnalystApproved with editsData protection officer
    W-14DecomposerRejectedEngineering lead
    R-3.7ElicitorApprovedProduct owner

    214 of 312 claims agent-originated · 100% human-reviewed · 0 unattributed

    09 The rigor dial

    One product, from prototype to defense program.

    LeanPrototype CommercialMost teams start here RegulatedMedical · fintech Safety-criticalAuto · aerospace Defense programGovernment
    Change controlAuthor approves Quorum board, e-signature
    VerificationImplementer may verify Independent and witnessed
    FindingsAdvisory Gate-blocking
    Lifecycle from evidenceCI moves claims to Verified Evidence recorded, a person attests

    Rigor profiles, the evidence-driven lifecycle, and witnessed verification are available today; e-signature arrives with the regulated tier.

    Per program

    Run a prototype at Lean and a certified subsystem at Safety-critical — same people, same benches, same tool.

    Raise without migrating

    Go from your first customer to your first certification by turning a dial, not by switching to a heavyweight ALM.

    Built for it from day one

    Tenant isolation enforced by the database, immutable baselines, and a hash-chained audit log — not bolted on later.

    10 Every engineering discipline

    Link versions, not copies.

    Progros doesn't mirror your repository or your PDM vault. It records which revision of which work product proves which requirement — the same model whether that's a commit, a board revision, or a stress report. Any discipline can record a result today: the method, the unit or revision it was run on, the files that prove it, and a witness.

    • SoftwareCI, git, and coding agents
    • Test & labRecorded, witnessed results
    • Firmware & embeddedJUnit and recorded results
    • SystemsReqIF and spreadsheet import
    • ElectricalRecorded results · connectors planned
    • MechanicalRecorded results · connectors planned
    • StructuresRecorded results · connectors planned
    • Thermal & fluidsRecorded results · connectors planned
    • Manufacturing & qualityPlanned

    11 Where it fits

    Everything exists somewhere. Nothing in one graph.

    How Progros compares with the tool categories programs use today
    Intent & requirementsEvidence & verificationAcceptance from intentGoverned AIEngineer-grade UXResources & plans against reality
    Issue trackersJira · Linear · Azure DevOps
    Requirements / ALMDOORS · Polarion · Codebeamer · Jama
    Test managementTestRail · Zephyr · qTest
    AI coding agentsMake the new bottleneck worse, faster
    ProgrosBy design

    Core strengthPartialStructurally absentOn our roadmap

    12 Getting started

    Start with a diagnostic. Change nothing.

    1. 1

      Bring one spec

      Upload a requirements document. Within minutes you have cited claims and a diagnostic of what's missing, implied, or unprovable.

    2. 2

      Agree acceptance

      Review the derived intent, scenarios, and criteria — then take the open questions to your customer before anyone builds.

    3. 3

      Plan and connect the work

      Accept the work breakdown, connect your repository and coding agents, and add one step to your pipeline. Evidence starts flowing from the next build.

    4. 4

      Raise rigor when you need it

      Regulated customer, certification, government contract: turn the dial for that program. Same tool, same data.

    Get started

    Bring one spec.
    See what it finds.

    Create a workspace in a couple of minutes and run your first diagnostic today.

    1. Create your workspace with your work email.
    2. Confirm your email — the link opens Progros, ready to go.
    3. Upload one spec and read what it finds.

    Create your workspace

    Already have an account? Sign in. Questions first? Read the FAQ.

    Regulated, safety-critical, or defense?

    Tell us about your program — we'll talk through deployment, rigor, and how your data is handled.

    Engineering disciplines involved optional

    We use your details only to contact you about Progros. No newsletters, no sharing.

    Questions

    Asked, answered.

    Does Progros replace Jira?

    Not on day one, and you don't need it to. Start with a diagnostic of one specification and keep your tracker. Progros holds what a tracker can't — what must be true, how it's proven, and whether the customer accepts it. When you're ready, its work breakdown and board can carry the work too: derived from the requirements, moved by branches and merges, and flagged when a requirement changes underneath it.

    Does my data train AI models?

    No. Your data is never used to train any model. Every model call is recorded on a ledger with its inputs, outputs, model, and prompt version, so you can see exactly what the AI did with what.

    Which AI does it use?

    Claude, by Anthropic, through Progros's own inference gateway — which records every call, attributes it to the program it served, and keeps the agents' prompts registered and versioned.

    Can the AI change our requirements?

    Agents propose; people decide. Every claim, criterion, and scenario an agent drafts goes to a review queue where you accept, amend, or reject it. At higher rigor levels, agents may only propose. Coding agents connected over MCP can read requirements and ask questions — they can never edit the specification.

    We're regulated, or a defense program. Is it ready for us?

    It was designed for you from the first line: database-enforced tenant isolation, immutable baselines, a hash-chained audit log, and rigor profiles up to Defense, and witnessed verification. The architecture is built so dedicated, government-cloud, and air-gapped deployments run the same code; e-signature arrives with the regulated tier. Tell us about your program when you sign up and we'll talk through what you need.

    Is it only for software?

    No. Software connects through CI, git, and coding agents, and firmware and lab tests that produce JUnit results take the same path. Every other discipline records results directly — a bench run, an inspection, an analysis — with the files that prove it, the unit or revision it was run on, and a witness where needed. Connectors to electrical, mechanical, and PDM tools are on the roadmap. Tell us what you use.

    Can it help us bid?

    Yes. Bid mode takes the customer's requirements through intent, a work breakdown, and estimates with their basis, then prices them with your rate cards, subcontracts, materials, and other costs — with a price-to-win analysis and a bid document to send. If you win, the bid becomes the program, with nothing re-entered.